Recherche sur le site
Recherche libre
Optimising the design and management of installations in the framework of the management plan to save the eel | Rencontres-synthèse |
The Eels & Installations R&D programme targeted a number of operational goals that resulted in the development and testing of technical solutions designed for rapid implementation in the field. All programme results were presented at the feedback symposium which brought together researchers, water managers, associations and hydroelectric companies. This document presents the results of the programme to restore eel stocks.

Dam removal - The Sélune River free to run - n°70 | Rencontres |
What happens when a river is once again free to run? In the Sélune valley (Manche department in Normandy), the largest dam-removal project in Europe is being carried out in step with an unprecedented scientific programme aiming to better understand the changes in the ecosystem, monitor the return of migratory fish and participate in the future development of the valley.
